Our installers, your Berkshire venue

Soft Play Installation Berkshire

Our own installation team surveys, delivers, builds and safety-checks commercial soft play at venues throughout Berkshire, then supports you after opening.

Berkshire installation in brief
  • Installed by Soft Play Supplies staff, start to finish
  • A survey before production so every piece fits
  • Checked against the drawings before we hand over
  • Fitting planned around opening hours where we can
  • Six-month maintenance return visit for Berkshire sites
Soft Play Supplies installation team assembling a steel soft play frame on site at Zouch School

Zouch School, Wiltshire: our installers part-way through assembling the frame

How Soft Play Installation Works in Berkshire

Soft play installation in Berkshire is carried out by our own team from start to finish: survey, design, manufacture in Swansea and fitting on site. Typical jobs include a Slough warehouse mezzanine, a Newbury town-centre shop, a Wokingham school hall that must be ready for Monday, or a hotel function room near Windsor.

There is no Soft Play Supplies depot or office in Berkshire. Your equipment travels from Swansea along the M4 on an agreed date, and the people who built it assemble it, so questions on the day get an informed answer. Sites in central Reading, Windsor or Maidenhead still need loading, parking and lift bookings agreed in advance.

Still choosing equipment? See soft play manufacturers Berkshire or commercial soft play Berkshire, or browse the full product range.

Inside a Berkshire Installation

Every Berkshire installation runs through the same five steps.

1

Site survey

We measure the space, walk the route from vehicle to room, and confirm headroom and services against the approved drawings.

2

Delivery

Equipment leaves Swansea on a date agreed with you, and unloading is timed around access rules and your opening hours.

3

Assembly

The frame goes up first, followed by padding, nets, slides and flooring, with work split into zones if you stay open.

4

Testing and safety checks

Each part is checked against the drawings and against BS EN 1176 and BS EN 1177 before sign-off.

5

Handover

Your Berkshire staff are shown round the finished area, and we come back six months after opening for a maintenance visit.

Free consultation

Getting your Berkshire site ready

We confirm everything at the survey, but early answers save time:

  • Door widths, lifts, stairs and where a van can unload
  • How much floor and headroom you have, measured under beams and ducts
  • A flat, finished floor we can lay surfacing on
  • Sockets or supplies for any lit or interactive panels
  • Clear fire exits and any building work still outstanding

Prefer to talk? Call 01792 439436.

Product Interested In:
Service Interested In:

Soft Play Installation Costs in Berkshire

Installation is priced within the project quotation. For Berkshire sites, smaller, straightforward installations typically start from around £5,000, while large, fully themed centres can exceed £250,000. Equipment, delivery to Berkshire and fitting appear as separate lines.

Payment stages

50%

Deposit with order

40%

On delivery to site

10%

When fitting is complete

This split applies unless other terms are agreed in writing; our terms and conditions have the detail.

What moves the fitting price

  • Play area size and the number of decks in it
  • Distance and access between the unloading point and the room
  • The flooring and impact surfacing specified
  • Extras such as theming, graphics and interactive play
  • Phasing the fit if your venue keeps trading

Lead time and finance

Lead time

Once the design is approved and production confirmed, most Berkshire installations can be completed within a matter of weeks. The quotation shows expected time on site.

Finance options

UK business users can lease through Johnson Reed Ltd, a specialist soft play finance company, rather than paying for the whole installation upfront; see our finance page.

Subject to status and credit approval for Berkshire applicants; a deposit, advance rental or personal guarantee may be requested, and documentation fees may apply.

Soft Play Manufacturers and Installation in Berkshire

Some Berkshire buyers end up with one firm supplying the kit and another fitting it. We keep design, manufacture and installation in one business, so Berkshire clients benefit from:

  • Equipment and fitting planned together, with nothing improvised on the day
  • A single named contact for the whole Berkshire project, backed by dedicated project management
  • Technical drawings and fire-escape layouts ready for your architect, contractor or building control
  • Fitting to BS EN 1176 and BS EN 1177 on every Berkshire job
  • Aftercare from the installers who fitted your Berkshire site, covering inspections, spare parts, upgrades and extensions. See the sectors we serve
Completed compact soft play installation with green padded frame, slide and ball pool at Zouch School

Projects fitted by our own installers

No Berkshire case study is published yet; recent work by our own installers includes Sgiliau in Llanelli, Pebble & Nest in London, Zouch School in Tidworth and Indoor Jumping Club in Barcelona.

Indoor play centre in Llanelli, Wales, with sensory features
View project

Indoor soft play in London for children up to 12, with an under 3s area
View project

Early years soft play room for Zouch School, Tidworth, Wiltshire
View project

Farm park development featuring soft play and a trampoline park
View project

Party rooms with separate under 5s and over 5s play zones
View project

Trampoline park fitted for Indoor Jumping Club, Barcelona
View project

What our clients say

I recently had the pleasure of working with a trampoline park manufacturer that exceeded all of my expectations. From our very first interaction, their professionalism and commitment to great service were evident. They took the time to understand my vision and provided invaluable guidance throughout the entire process.

Ady, Jump Adventure

We recently had the pleasure of working with Soft Play Supplies, a soft play manufacturer, and we cannot recommend them enough. From start to finish, their team was professional, efficient, and dedicated to providing the best service possible. Their design team was able to bring our vision to life, creating a unique and engaging soft play area that exceeded our expectations.

William & Martha, Oakie Doke’s Playhouse

Projects One worked closely with Soft Play Supplies to deliver an unusual and challenging project in mainland Europe. The team were nothing short of outstanding from the design and estimating phase through to delivery and installation.

Richard, Projects One

Brands and venues we have worked with

Projects OneZoomania Play CentresSafari Soft Play CaféJump AdventureIndoor Jumping Club BarcelonaOakie Doke’s PlayhouseCefn Mably Farm ParkMoody Meadows Farm ParkPebble & NestRainforest RascalsZouch SchoolSgiliau Llanelli

Soft Play Installation Berkshire: Questions Answered

Yes. Our own installers fit soft play throughout Berkshire, travelling from our Swansea factory. There is no Soft Play Supplies depot or premises in Berkshire.

No. Every installation is done by Soft Play Supplies' own team, the same company that designs and manufactures the equipment.

For Berkshire jobs it comes down to scale and complexity. Once the design is approved and production confirmed, most installations can be completed within a matter of weeks, and the quotation lists the expected days on site.

Installation is itemised inside the project quotation. As a guide for Berkshire, smaller, straightforward installations typically start from around £5,000, and large, fully themed centres can exceed £250,000.

The standard split for Berkshire orders is a 50% deposit with your order, 40% when equipment is delivered and 10% on completion, unless other terms are agreed in writing.

Often, yes, depending on the layout and the work involved. We plan the order of work for each Berkshire venue to keep disruption low and confirm what is realistic at the survey.

For a Berkshire fit we need clear delivery access, a level and finished floor, a confirmed ceiling height, power where lighting or interactive features need it, and unobstructed fire exits.

Yes. We can arrange removal of existing play equipment, and fit extensions or upgrades in venues that are still trading.

Every element is compared with the approved drawings and with BS EN 1176 and BS EN 1177 before we walk your staff round the finished area.

We return six months after opening for a maintenance visit, and maintenance, safety inspections, spare parts and upgrades remain available for your Berkshire venue.

Get in touch

Book a free consultation for your Berkshire installation

Use the form for your venue details, or phone or email us if that is easier.

Product Interested In:
Service Interested In: