Soft Play Installation Glasgow
Soft Play Supplies installers survey, deliver, assemble and test commercial soft play for Glasgow venues, and come back for aftercare once you are trading.
- Our own payroll installers carry out every Glasgow fit
- A measured survey comes before any manufacturing
- Each element is checked and signed off before you open
- Work phased around trading hours where the room allows
- A return maintenance visit six months after launch
The finished soft play frame our installers fitted at Zouch School in Wiltshire
Soft Play Installation in Glasgow by the Team That Built It
Survey, design, manufacture in Swansea and fitting are all carried out by Soft Play Supplies staff. Around Glasgow, a typical brief might be a warehouse unit at Hillington, a first-floor space above shops on Byres Road, a primary school hall in Govan that must be cleared before term or a Southside church conversion.
We have no depot or office in Glasgow or anywhere in Scotland, and we are upfront that this is a long way from our factory. The equipment is loaded in Swansea and driven north on a date you agree, and delivery and installation are each itemised in the quotation. Tenement closes, shared back courts and busy city-centre streets mean parking, unloading and carry routes need confirming well before the van sets off.
Not settled on equipment yet? Read soft play manufacturers Glasgow or commercial soft play Glasgow, or view our products.
Step by Step: A Glasgow Installation
Our Glasgow fits always follow this five-step order.
Site survey
We measure the space, walk the route from vehicle to room, and check heights and services against the approved plans.
Delivery
Your equipment travels up from Swansea on the agreed date, with unloading booked to fit access limits and opening times.
Assembly
The structure goes up first, followed by padding, netting, slides and surfacing, done zone by zone if you keep trading.
Testing and safety checks
We test every element against the plans and the requirements of BS EN 1176 and BS EN 1177 prior to handover.
Handover
Your staff get a guided tour of the new area, and we revisit six months after opening for a maintenance check.
Before we arrive in Glasgow
The survey covers these points, though knowing them early speeds things up:
- Route in: close and stair widths, lifts and a spot for the van
- Usable floor area and the lowest overhead obstruction
- A flat, finished base ready for safety flooring
- Electrical points for lighting or interactive panels
- Clear fire exits and any builders still on site
You can also phone us on 01792 439436.
Soft Play Installation Costs in Glasgow
Installation is costed inside the overall project quotation. Smaller, straightforward Glasgow installations typically start from around £5,000, and large, fully themed centres can exceed £250,000. Equipment, delivery and fitting are listed on separate itemised lines.
Payment stages
Deposit with order
On delivery to site
On completion of fitting
Unless alternative terms are agreed in writing, these stages apply. The wording is set out in our terms and conditions.
Installation cost factors
- Footprint of the play area and its levels
- Carry distance and stairs between van and room
- The safety floor specified under the frame
- Themed pieces, print panels and interactive kit
- Fitting around customers in a venue that stays open
Lead time and finance
Lead time
With your design signed off and our production run confirmed, most installations can be completed within a matter of weeks. The Glasgow quotation states the expected days on site.
Finance options
As UK business users, Glasgow firms can lease through Johnson Reed Ltd, a specialist in soft play finance. Our finance page describes the leasing route.
Each Glasgow lease is subject to status and credit approval, and Johnson Reed may want a deposit, advance rental or personal guarantee, and documentation fees can be charged.
Soft Play Manufacturers and Installation in Glasgow
Many play suppliers deliver the kit and leave fitting to another firm. Design, manufacture and installation all stay with us, so Glasgow clients get:
- Equipment and installation planned as one job, so nothing is made up on the day
- A named project contact throughout, with dedicated project management
- Technical drawings and fire-escape plans for your architect, builder or building standards officer
- Glasgow installations completed to BS EN 1176 and BS EN 1177
- Ongoing care from the installers themselves, covering inspections, spare parts, upgrades and extensions. Browse the sectors we serve
Our installation portfolio
No Glasgow case study is published yet; recent work by our own installers includes Sgiliau in Llanelli, Pebble & Nest in London, Zouch School in Tidworth and Indoor Jumping Club in Barcelona.
Interactive, sensory-led play centre in Llanelli, south Wales
View project
Soft play for children up to twelve plus a baby zone, London
View project
Early years soft play installed at Zouch School, Wiltshire
View project
Farm park project combining soft play with trampolines
View project
Play centre with party rooms and age-split play areas
View project
Indoor Jumping Club trampoline park, Spain
View project
What our clients say
I recently had the pleasure of working with a trampoline park manufacturer that exceeded all of my expectations. From our very first interaction, their professionalism and commitment to great service were evident. They took the time to understand my vision and provided invaluable guidance throughout the entire process.
Ady, Jump Adventure
We recently had the pleasure of working with Soft Play Supplies, a soft play manufacturer, and we cannot recommend them enough. From start to finish, their team was professional, efficient, and dedicated to providing the best service possible. Their design team was able to bring our vision to life, creating a unique and engaging soft play area that exceeded our expectations.
William & Martha, Oakie Doke’s Playhouse
Projects One worked closely with Soft Play Supplies to deliver an unusual and challenging project in mainland Europe. The team were nothing short of outstanding from the design and estimating phase through to delivery and installation.
Richard, Projects One
Brands and venues we have worked with
Soft Play Installation Glasgow: Questions We Hear
Yes. Our installation team travels from the Swansea factory to fit soft play across Glasgow. No Soft Play Supplies depot, office or premises exists in Scotland.
Soft Play Supplies' own installers, who work for the same company that designs and makes the equipment. We do not pass the job to subcontractors.
Larger, more complex schemes need more time. With the design approved and production confirmed, most installations can be completed within a matter of weeks, and the quotation shows the expected days on site.
Yes. Delivery to Glasgow and installation each appear as itemised lines. Glasgow budgets for smaller projects typically start from around £5,000, rising beyond £250,000 for large, fully themed centres.
Our standard terms are a 50% deposit with the order, 40% when equipment is delivered and the remaining 10% on completion, unless agreed otherwise in writing.
In many cases, depending on the room and the work involved. We plan the order of work to keep disruption low and confirm the approach at survey.
Clear access for delivery, a flat finished floor, a confirmed ceiling height, power where lighting or interactive features need it, and fire exits free of obstruction.
Yes. We can organise removal of existing equipment and install extensions or upgrades in venues that are still open.
We inspect every element against the approved plans and against BS EN 1176 and BS EN 1177, then take your staff round the completed area.
Yes. Our crew comes back for a maintenance visit six months after you open. Afterwards you can book maintenance, inspections, parts and upgrades.
Arrange a free consultation for your Glasgow installation
Use the form to tell us about the site, or reach us by phone or email.
- 01792 439436
- max@softplaysupplies.com
- Soft Play Supplies, Unit B3 Mardy Trading Estate, Swansea, SA4 4HJ, United Kingdom
- Enquiries answered within four business hours