Fitted across Hertfordshire by our own team

Soft Play Installation Hertfordshire

Our own installers survey, deliver, assemble and test commercial soft play for venues across Hertfordshire, with aftercare once you open.

Hertfordshire installation at a glance
  • Fitted by our own installation team
  • Site survey before production, so everything fits
  • Safety checked and signed off before opening
  • Work sequenced around your trading hours where possible
  • We come back six months after opening for maintenance
Soft Play Supplies installation team assembling a steel soft play frame on site at Zouch School

Our installers putting up a play frame at Zouch School, Wiltshire

Soft Play Installation in Hertfordshire, Start to Finish

We handle the whole job ourselves: survey, design, manufacture in Swansea and fitting by our own installers. In Hertfordshire that might mean a business-park unit in Hemel Hempstead with a goods lift, a first-floor room above shops in Hitchin, a school hall in Stevenage that must be clear by Monday, or a farm barn outside Bishop’s Stortford.

We have no depot or office in Hertfordshire. The equipment is driven from Swansea on an agreed date and the team that built it puts it together, so any question on the day gets a straight answer from someone who knows the design. The M1, M25 and A1(M) make delivery planning simpler, although town-centre sites in places like St Albans or Hertford still need parking and unloading agreed in advance.

Still deciding on equipment? Visit soft play manufacturers Hertfordshire or commercial soft play Hertfordshire, or browse our products.

What Happens on a Hertfordshire Installation

Every Hertfordshire installation follows the same sequence, so nothing on the day comes as a surprise.

1

Site survey

We measure the room, check the route from van to floor, and confirm ceiling heights and services against the approved drawings.

2

Delivery

We bring the equipment from Swansea on a date you agree, with unloading arranged around access rules and opening times.

3

Assembly

The team builds the frame first, then fits padding, netting, slides and flooring, working in zones if the venue stays open.

4

Testing and safety checks

Every component is checked against the drawings and BS EN 1176 and BS EN 1177 before we sign it off.

5

Handover

We show your staff around the finished play area and return six months after opening for a maintenance visit.

Free consultation

Preparing your Hertfordshire site

We check all of this at the survey, but having the answers early helps:

  • Access: door widths, lifts, stairs and where the van can park
  • Floor area and clear height, including beams, ducts and lights
  • A flat, finished floor that surfacing can be laid on
  • Power for lighting and any interactive features
  • Fire exits and any building work still to complete

Rather talk? Call 01792 439436.

Product Interested In:
Service Interested In:

Soft Play Installation Costs in Hertfordshire

Installation is part of the project quotation rather than an extra. Smaller, straightforward installations typically start from around £5,000, while large, fully themed centres can exceed £250,000. Equipment, delivery to Hertfordshire and fitting are each listed separately.

Payment stages

50%

Deposit with order

40%

On delivery to site

10%

Once fitting is finished

Standard stages apply unless other terms are agreed in writing. See our terms and conditions.

What affects installation cost

  • Size of the play area and number of levels
  • Distance and access from the unloading point to the room
  • Type of flooring and safety surfacing
  • Theming, printed panels and interactive elements
  • Whether work must fit around a trading venue

Lead time and finance

Lead time

Most Hertfordshire installations can be completed within a matter of weeks of design approval and confirmed production. Your quotation shows the expected time on site.

Finance options

UK business users can spread the cost by leasing through Johnson Reed Ltd, a specialist soft play finance provider. See our finance page.

Subject to status and credit approval; a deposit, advance rental or personal guarantee may be requested and documentation fees may apply.

Soft Play Manufacturers and Installation in Hertfordshire

Many suppliers sell equipment and leave the fitting to someone else. We keep design, manufacture and installation in one company, which means Hertfordshire clients get:

  • Equipment and fit-out planned together, so nothing is improvised on site
  • A single named contact for the whole job, backed by dedicated project management
  • Technical drawings and fire-escape layouts for your architect, contractor or building control
  • Fitting carried out in line with BS EN 1176 and BS EN 1177
  • Aftercare from the people who fitted it, including inspections, spare parts, upgrades and extensions. See the sectors we work in
Green wave slide inside a padded soft play frame after installation

Installations by our own teams

Our Hertfordshire case study is still to come; meanwhile our installers’ projects include Sgiliau in Llanelli, Pebble & Nest in London, Zouch School in Tidworth and Indoor Jumping Club in Barcelona.

Sensory and interactive soft play centre in Llanelli, Wales
View project

Soft play for children up to 12 with a dedicated under 3s area, London
View project

School soft play room for early years pupils in Tidworth, Wiltshire
View project

Farm park development with soft play and a trampoline park
View project

Party rooms plus separate play zones for under 5s and over 5s
View project

Trampoline park installation in Barcelona, Spain
View project

What our clients say

I recently had the pleasure of working with a trampoline park manufacturer that exceeded all of my expectations. From our very first interaction, their professionalism and commitment to great service were evident. They took the time to understand my vision and provided invaluable guidance throughout the entire process.

Ady, Jump Adventure

We recently had the pleasure of working with Soft Play Supplies, a soft play manufacturer, and we cannot recommend them enough. From start to finish, their team was professional, efficient, and dedicated to providing the best service possible. Their design team was able to bring our vision to life, creating a unique and engaging soft play area that exceeded our expectations.

William & Martha, Oakie Doke’s Playhouse

Projects One worked closely with Soft Play Supplies to deliver an unusual and challenging project in mainland Europe. The team were nothing short of outstanding from the design and estimating phase through to delivery and installation.

Richard, Projects One

Brands and venues we have worked with

Projects OneZoomania Play CentresSafari Soft Play CaféJump AdventureIndoor Jumping Club BarcelonaOakie Doke’s PlayhouseCefn Mably Farm ParkMoody Meadows Farm ParkPebble & NestRainforest RascalsZouch SchoolSgiliau Llanelli

Soft Play Installation Hertfordshire: Your Questions

Yes. Our own installation team fits soft play anywhere in Hertfordshire, travelling from our Swansea factory. We have no depot or premises in the county.

No. Installation is carried out by Soft Play Supplies' own team, part of the same company that designs and manufactures the equipment.

That comes down to the size and complexity of the job. After design approval and confirmed production, most installations can be completed within a matter of weeks, and your quotation gives the expected days on site.

Yes, installation is itemised within the project quotation. As a guide, smaller projects typically start from around £5,000 and large, fully themed centres can exceed £250,000.

A 50% deposit when you order, 40% when the equipment is delivered and 10% on completion, unless other terms are agreed in writing.

Often, depending on the layout and the work involved. We plan the order of work to limit disruption and confirm what is possible at the survey.

Clear access for delivery, a level finished floor, confirmed ceiling height, power where lighting or interactive features need it, and unobstructed fire exits.

Yes. We can arrange removal of existing equipment and fit extensions or upgrades into venues that are already trading.

We check every element against the approved drawings and against BS EN 1176 and BS EN 1177, then walk your team round the finished area.

A maintenance visit follows six months after opening. Maintenance, safety inspections, spare parts and upgrades are available after that.

Get in touch

Arrange a free consultation for your Hertfordshire installation

Share your venue details using the form, or contact us directly by phone or email.

Product Interested In:
Service Interested In: