Installed in Oxfordshire by the team that built it

Soft Play Installation Oxfordshire

Our own installers survey, deliver, build and safety-check soft play at Oxfordshire venues, then return for aftercare once you are open.

Oxfordshire installs in brief
  • No subcontractors, only our own fitting crew
  • A measured survey before anything is made
  • Safety sign-off before the public arrives
  • Work planned around trading where possible
  • A maintenance visit six months after opening
Multi-level soft play frame installed at Sgiliau Llanelli indoor play centre by Soft Play Supplies

Sgiliau Llanelli indoor play centre in Wales, fitted by our installation team

Soft Play Installation Oxfordshire, Handled by One Team

From the first survey to the final safety check, one company is responsible: we design the layout, manufacture it in Swansea and send our own installers to fit it. In Oxfordshire that could mean a unit on a Banbury or Bicester industrial estate, a first-floor space above shops in Witney, an Abingdon school hall that must be clear by Monday morning, or a stone barn near Chipping Norton.

Soft Play Supplies has no depot or office in Oxfordshire. Your equipment leaves Swansea on a booked date, and the people who made it put it together on site. Central Oxford sites need extra planning, because narrow streets, restricted loading and city-centre traffic controls make unloading times critical, so we agree access with you well before delivery day.

Still choosing equipment? Visit soft play manufacturers Oxfordshire or commercial soft play Oxfordshire, or browse our products.

Inside an Oxfordshire Installation, Step by Step

Each Oxfordshire installation runs through five fixed stages, so you know what is happening on every day.

1

Site survey

Our surveyor records room dimensions, the carry route from vehicle to floor, ceiling heights and services, checking all of it against the approved drawings.

2

Delivery

Equipment arrives from Swansea on the agreed date, with unloading timed around access rules and your opening hours.

3

Assembly

Our crew erects the frame first, then adds padding, nets, slides and flooring, working zone by zone if you stay open.

4

Testing and safety checks

We inspect every component against the approved drawings and BS EN 1176 and BS EN 1177 before signing the job off.

5

Handover

Your staff get a guided walk-round of the finished area, and we revisit six months after opening for a maintenance visit.

Free consultation

Getting your Oxfordshire site ready

Our surveyor will check all of this, though knowing it early speeds things up:

  • Access: doorways, lifts, stairs and parking for the van
  • Floor size and clear height, including beams, ducts and lighting
  • A flat, finished floor ready for surfacing
  • Electrical supply for any lit or interactive elements
  • Fire exits, and any building work still outstanding

Prefer to talk? Phone 01792 439436.

Product Interested In:
Service Interested In:

Soft Play Installation Costs in Oxfordshire

Fitting is built into the project quotation, not added later. Oxfordshire budgets vary widely: a smaller, straightforward installation typically starts from around £5,000, and a large, fully themed centre can pass £250,000. Equipment, delivery to Oxfordshire and installation are each shown on their own line.

Payment stages

50%

Deposit with order

40%

On delivery to site

10%

On completion of fitting

Standard staging, unless something else is agreed in writing; the full wording sits in our terms and conditions.

Price factors on an Oxfordshire fit

  • Play area size and level count
  • How far equipment must be carried from the van
  • Your choice of flooring and impact surfacing
  • Graphics, theming and interactive extras
  • Working around a venue that stays open

Lead time and finance

Lead time

Most Oxfordshire installations can be completed within a matter of weeks after the design is approved and production confirmed. Your quotation states the expected days on site.

Finance options

Rather than paying in one lump sum, UK business users can lease through Johnson Reed Ltd, specialists in soft play finance. See our finance page.

Applications are subject to status and credit approval; a deposit, advance rental or personal guarantee may be required, and documentation fees may apply.

Soft Play Manufacturers and Installation in Oxfordshire

Some firms supply equipment and leave the installation to a contractor. Keeping design, manufacture and installation inside one business gives Oxfordshire clients:

  • Equipment and fit-out planned as one job, so nothing is improvised on the day
  • One named contact throughout, backed by dedicated project management
  • Drawings and fire-escape layouts prepared for your architect or building control officer
  • Fitting checked against BS EN 1176 and BS EN 1177 at every stage
  • Aftercare from the fitters themselves, including inspections, spare parts, upgrades and extensions. Our sectors page shows where we work
Zouch School soft play installation by Soft Play Supplies

Recent installations by our teams

No Oxfordshire case study is published yet; recent work by our own installers includes Sgiliau in Llanelli, Pebble & Nest in London, Zouch School in Tidworth and Indoor Jumping Club in Barcelona.

Llanelli, Wales: sensory and interactive play centre
View project

London: soft play for under 12s with a separate under 3s zone
View project

Tidworth, Wiltshire: early years soft play at Zouch School
View project

Moody Meadows: farm park soft play and trampolines
View project

Rainforest Rascals: party rooms and age-split play zones
View project

Barcelona, Spain: Indoor Jumping Club trampoline park
View project

What our clients say

I recently had the pleasure of working with a trampoline park manufacturer that exceeded all of my expectations. From our very first interaction, their professionalism and commitment to great service were evident. They took the time to understand my vision and provided invaluable guidance throughout the entire process.

Ady, Jump Adventure

We recently had the pleasure of working with Soft Play Supplies, a soft play manufacturer, and we cannot recommend them enough. From start to finish, their team was professional, efficient, and dedicated to providing the best service possible. Their design team was able to bring our vision to life, creating a unique and engaging soft play area that exceeded our expectations.

William & Martha, Oakie Doke’s Playhouse

Projects One worked closely with Soft Play Supplies to deliver an unusual and challenging project in mainland Europe. The team were nothing short of outstanding from the design and estimating phase through to delivery and installation.

Richard, Projects One

Brands and venues we have worked with

Projects OneZoomania Play CentresSafari Soft Play CaféJump AdventureIndoor Jumping Club BarcelonaOakie Doke’s PlayhouseCefn Mably Farm ParkMoody Meadows Farm ParkPebble & NestRainforest RascalsZouch SchoolSgiliau Llanelli

Soft Play Installation Oxfordshire: Questions Answered

Yes. Our own installers fit soft play anywhere in Oxfordshire, travelling from our Swansea factory. We have no depot, office or premises in the county.

No. Every installation is carried out by Soft Play Supplies' own staff, employed by the same company that designs and manufactures the equipment.

It hinges on the scale of the scheme. Once the design is approved and production is confirmed, most installations can be completed within a matter of weeks, and your quotation lists the expected days on site.

Installation is itemised within the project quotation. As a guide, smaller projects typically start from around £5,000, while large, fully themed centres can go above £250,000.

A 50% deposit on order, 40% on delivery and 10% on completion, unless different terms are agreed in writing.

In many cases, depending on the layout and how much work is involved. We sequence the work to limit disruption and confirm what is realistic at the survey.

A clear delivery route, a flat finished floor, the confirmed ceiling height, power wherever lighting or interactive pieces need it, and fire exits kept free.

Yes. Old frames can be stripped out through our removal service before the new equipment goes in, and we also add extensions to venues that are still trading.

We test every element against the approved drawings and the BS EN 1176 and BS EN 1177 standards before handing over, then show your staff round.

We return for a maintenance visit six months after opening, and maintenance, safety inspections, spare parts and upgrades are available after that.

Get in touch

Book a free consultation for your Oxfordshire installation

Send your venue details through the form, or call or email the team.

Product Interested In:
Service Interested In: