Fitted in Tyne and Wear by our own installers

Soft Play Installation Tyne and Wear

Our own crew surveys, delivers, builds and safety-checks commercial soft play for venues across Tyne and Wear, then supports you after opening.

Tyne and Wear installation in brief
  • Fitted by Soft Play Supplies staff, not subcontractors
  • A full site survey before production
  • Inspected and signed off before your doors open
  • Work planned around your trading hours where we can
  • We come back for maintenance six months after opening
Soft Play Supplies installation team assembling a steel soft play frame on site at Zouch School

Soft Play Supplies installers building a frame at Zouch School in Wiltshire

Soft Play Installation in Tyne and Wear, Handled In-House

We run the entire job ourselves: survey, design, manufacture in Swansea and fitting by our own installation team. Around Tyne and Wear that could be a unit on a Gateshead trading estate, a first-floor space in Sunderland, a school hall in North Tyneside, or a former social club in Jarrow.

There is no Soft Play Supplies depot or office in Tyne and Wear. Equipment travels from Swansea on a booked date and is assembled by the people who made it. The A1, A19 and Tyne Tunnel make most sites easy to reach, though city-centre jobs in Newcastle or Sunderland need unloading slots agreed beforehand.

Still choosing equipment? See soft play manufacturers Tyne and Wear or commercial soft play Tyne and Wear, or look through our products.

Your Tyne and Wear Installation, Step by Step

Each Tyne and Wear installation follows one fixed order.

1

Site survey

We measure the room, walk the route from the van to the play area, and check ceiling heights and services against the approved plans.

2

Delivery

Equipment is driven up from Swansea on a booked date, with unloading timed around access restrictions and your opening hours.

3

Assembly

Frames go up first, followed by padding, nets, slides and flooring, and we can work zone by zone if you stay open.

4

Testing and safety checks

Each element is compared with the drawings and checked against BS EN 1176 and BS EN 1177 before we sign it off.

5

Handover

Your staff get a walk-through of the finished area, and we return after six months for a maintenance visit.

Free consultation

Getting your Tyne and Wear site ready

We confirm all of this at the survey, but early answers save time:

  • Access routes: door widths, lifts, stairwells and van parking
  • Floor area and clear height, allowing for beams, ducts and lights
  • A flat, completed floor our surfacing can sit on
  • Sockets or supplies for lighting and interactive kit
  • Fire exits and any building works still outstanding

Want to talk it over? Call 01792 439436.

Product Interested In:
Service Interested In:

Soft Play Installation Costs in Tyne and Wear

Fitting is priced within the overall project quotation, never bolted on later. On Tyneside and Wearside, as elsewhere, smaller, straightforward installations typically start from around £5,000, and large, fully themed centres can exceed £250,000. Equipment, delivery to Tyne and Wear and installation each get their own line.

Payment stages

50%

Deposit with order

40%

On delivery to site

10%

When fitting is done

The split above is standard unless we agree other terms in writing; see our terms and conditions.

Factors behind the installation price

  • The footprint of the play area and its number of tiers
  • The carry distance from the drop-off point to the room
  • Which flooring and safety surfacing are specified
  • Theming, printed panels and interactive extras
  • Any need to build around a venue that keeps trading

Lead time and finance

Lead time

Once the design is approved and production confirmed, most Tyne and Wear installations can be completed within a matter of weeks. Your quotation shows the days our crew will need on site.

Finance options

UK business users can lease through Johnson Reed Ltd, a specialist soft play finance company, to spread the cost. Terms are explained on our finance page.

Finance is offered subject to status and credit approval. Lenders can ask for a deposit, advance rental or personal guarantee, and documentation fees may be charged.

Soft Play Manufacturers and Installation in Tyne and Wear

Some play suppliers stop at the sale and pass the fitting to an outside contractor. We keep design, manufacturing and installation together, so Tyne and Wear clients benefit from:

  • Equipment and fit-out planned as one job
  • A single point of contact from first survey to handover day, with dedicated project management
  • Technical drawings and fire-escape layouts ready for your architect, contractor or building control officer
  • Fitting work checked against BS EN 1176 and BS EN 1177
  • Follow-up support from the same fitters, including inspections, spare parts, upgrades and extensions. See the sectors we serve
Zouch School soft play installation by Soft Play Supplies

Work our fitters have completed

No Tyne and Wear case study is published yet; these projects are in Llanelli, London, Tidworth and Barcelona.

Llanelli play centre with sensory and interactive features
View project

London soft play for children up to 12, with an under 3s zone
View project

Early years soft play room at a Tidworth school, Wiltshire
View project

Farm park project pairing indoor soft play with trampolines
View project

Split under 5s and over 5s zones, with party rooms
View project

Trampoline park fitted for a client in Barcelona
View project

What our clients say

I recently had the pleasure of working with a trampoline park manufacturer that exceeded all of my expectations. From our very first interaction, their professionalism and commitment to great service were evident. They took the time to understand my vision and provided invaluable guidance throughout the entire process.

Ady, Jump Adventure

We recently had the pleasure of working with Soft Play Supplies, a soft play manufacturer, and we cannot recommend them enough. From start to finish, their team was professional, efficient, and dedicated to providing the best service possible. Their design team was able to bring our vision to life, creating a unique and engaging soft play area that exceeded our expectations.

William & Martha, Oakie Doke’s Playhouse

Projects One worked closely with Soft Play Supplies to deliver an unusual and challenging project in mainland Europe. The team were nothing short of outstanding from the design and estimating phase through to delivery and installation.

Richard, Projects One

Brands and venues we have worked with

Projects OneZoomania Play CentresSafari Soft Play CaféJump AdventureIndoor Jumping Club BarcelonaOakie Doke’s PlayhouseCefn Mably Farm ParkMoody Meadows Farm ParkPebble & NestRainforest RascalsZouch SchoolSgiliau Llanelli

Soft Play Installation Tyne and Wear: Questions Answered

Yes. Our installers cover the whole of Tyne and Wear, working from our Swansea factory, as we have no depot or premises in the county.

No. Every installation is done by Soft Play Supplies staff, from the same company that designs and builds the equipment.

That turns on the scale and complexity of the build. With the design approved and production confirmed, most installations can be completed within a matter of weeks, and your quotation lists the expected days on site.

No hidden extra: installation sits as its own line in the project quotation. For guidance, smaller projects typically start from around £5,000, while large, fully themed centres can go beyond £250,000.

Unless other terms are agreed in writing: a 50% deposit when you order, 40% on delivery and 10% on completion.

Often, yes, depending on the layout and scope. We plan the sequence of work to keep disruption low and confirm the options at the survey.

Clear delivery access, a level and finished floor, a confirmed ceiling height, power wherever lighting or interactive features need it, and unblocked fire exits.

Yes. We can arrange removal of existing equipment and install extensions or upgrades in venues that are already open.

Every element is compared with the approved drawings and tested against BS EN 1176 and BS EN 1177, and then we walk your staff through the finished area.

We return six months after opening for a maintenance visit, and maintenance, safety inspections, parts and upgrades are on offer afterwards.