Fitted in West Yorkshire by our own team

Soft Play Installation West Yorkshire

Our employed fitters handle survey, delivery, build and safety checks for West Yorkshire venues, then return for aftercare after launch.

West Yorkshire installs at a glance
  • No subcontracted fitters at any stage
  • Measured survey before production starts
  • Everything checked before the public uses it
  • Phased work to protect trading where feasible
  • A maintenance return six months after opening
Soft Play Supplies installation team assembling a steel soft play frame on site at Zouch School

Frame assembly by our installation team at Zouch School, Wiltshire

Soft Play Installation in West Yorkshire Without Middlemen

One company carries your project from measurements to handover: we survey, design, manufacture in Swansea and send our own fitters to build it. In West Yorkshire that might be an upper floor of a converted mill in Dewsbury, a trade unit on an estate off the M62 near Brighouse, a primary school hall in Bradford that must reopen after half-term, or a shop unit in central Leeds.

We have no West Yorkshire depot or office. Your equipment is loaded in Swansea and driven up on the agreed date, and the crew who built it carries out the installation. Motorway access via the M1 and M62 is good, but steep streets in places like Halifax and Hebden Bridge, and loading restrictions in Leeds city centre, mean we agree vehicle access well before the day.

Choosing equipment first? Visit soft play manufacturers West Yorkshire or commercial soft play West Yorkshire, or browse the products.

How Each West Yorkshire Installation Unfolds

West Yorkshire installs follow five fixed stages.

1

Site survey

Our team confirms measurements, lifts, stairways and power against the signed-off drawings before anything is loaded.

2

Delivery

Equipment leaves Swansea on your chosen date, and unloading is booked around parking rules and your opening hours.

3

Assembly

Frames are erected first, then padding, netting, slides and flooring go in, area by area if you are still trading.

4

Testing and safety checks

Before sign-off, each component is tested against the approved plans and the requirements of BS EN 1176 and BS EN 1177.

5

Handover

We introduce your staff to the finished play area and come back after six months for a maintenance visit.

Free consultation

Readying a West Yorkshire site

We confirm these at survey, but sharing them now speeds things up:

  • The route in: door sizes, goods lifts, stairs and somewhere to park
  • Room dimensions and clear height beneath beams and lighting
  • A smooth, finished floor for the surfacing to sit on
  • Power supplies for lighting or interactive play
  • Escape routes, and any contractor work still in progress

To talk it through, phone 01792 439436.

Product Interested In:
Service Interested In:

Soft Play Installation Costs in West Yorkshire

Your quotation includes installation from the start. Smaller, straightforward installations typically start from around £5,000, with large, fully themed centres able to exceed £250,000; equipment, delivery to West Yorkshire and fitting are itemised separately.

Payment stages

50%

Deposit with order

40%

On delivery to site

10%

Once the fit is complete

Payments follow these stages unless something else is agreed in writing; see our terms and conditions.

What shapes installation cost

  • How big the play area is and how many tiers it stacks
  • Carrying distance and stairs between van and room
  • The flooring and surfacing specified
  • Themed features, print and interactive pieces
  • Phasing needed to keep a venue trading

Lead time and finance

Lead time

Most West Yorkshire installations can be completed within a matter of weeks of the design being approved and production confirmed. We put the expected number of fitting days in writing in the quote.

Finance options

UK business users can lease the equipment through Johnson Reed Ltd, a soft play finance specialist, rather than paying in one go. Read our finance page for more.

Leasing is subject to status and credit approval; the provider can ask for a deposit, advance rental or personal guarantee, and documentation fees may be added.

Soft Play Manufacturers and Installation in West Yorkshire

Because the same business designs, builds and installs, West Yorkshire clients get:

  • Fit-out planned alongside the equipment, so installation days run to plan
  • A dedicated contact for the whole project, with project management support
  • Technical drawings and fire-escape layouts to share with your architect or building control
  • Work carried out to BS EN 1176 and BS EN 1177
  • Aftercare by the team that installed it: inspections, spare parts, upgrades and extensions across all our sectors
Completed compact soft play installation with green padded frame, slide and ball pool at Zouch School

Installed by the crew that would fit yours

No West Yorkshire case study is published yet; recent work by our own installers includes Sgiliau in Llanelli, Pebble & Nest in London, Zouch School in Tidworth and Indoor Jumping Club in Barcelona.

Interactive and sensory soft play centre at Sgiliau in Llanelli, South Wales
View project

Play for children up to 12, with an under 3s zone, at Pebble & Nest in London
View project

Early years soft play fitted for Zouch School in Tidworth, Wiltshire
View project

Soft play and trampolines added to Moody Meadows Farm Park
View project

Party rooms beside separate under 5s and over 5s play at Rainforest Rascals
View project

Trampoline park fitted for Indoor Jumping Club in Barcelona
View project

What our clients say

I recently had the pleasure of working with a trampoline park manufacturer that exceeded all of my expectations. From our very first interaction, their professionalism and commitment to great service were evident. They took the time to understand my vision and provided invaluable guidance throughout the entire process.

Ady, Jump Adventure

We recently had the pleasure of working with Soft Play Supplies, a soft play manufacturer, and we cannot recommend them enough. From start to finish, their team was professional, efficient, and dedicated to providing the best service possible. Their design team was able to bring our vision to life, creating a unique and engaging soft play area that exceeded our expectations.

William & Martha, Oakie Doke’s Playhouse

Projects One worked closely with Soft Play Supplies to deliver an unusual and challenging project in mainland Europe. The team were nothing short of outstanding from the design and estimating phase through to delivery and installation.

Richard, Projects One

Brands and venues we have worked with

Projects OneZoomania Play CentresSafari Soft Play CaféJump AdventureIndoor Jumping Club BarcelonaOakie Doke’s PlayhouseCefn Mably Farm ParkMoody Meadows Farm ParkPebble & NestRainforest RascalsZouch SchoolSgiliau Llanelli

Soft Play Installation West Yorkshire: Questions Before You Book

Yes, from Wetherby to Holmfirth. Our own installers travel from the Swansea factory where the equipment is made; there is no West Yorkshire depot or premises.

Soft Play Supplies employees. We do not pass installation to subcontractors, because the same company designs, manufactures and fits.

Scale and complexity decide it, but most installations can be completed within a matter of weeks after the design is signed off and production confirmed. The quote lists the expected days on site.

It does, as an itemised line within the quotation. Smaller jobs typically start from around £5,000, and at the top end large, fully themed centres can exceed £250,000.

A 50% deposit at order, 40% on delivery and 10% at completion, unless other terms are agreed in writing.

In many venues, yes. It depends on the layout and scope; we sequence the work to minimise disruption and confirm what is realistic at survey.

A clear delivery route, a level finished floor, confirmed ceiling height, power where lighting or interactive features need it, and escape routes kept open.

Yes. We can arrange removal of existing equipment and fit extensions or upgrades into venues that are still trading.

Each element is tested against the approved drawings and BS EN 1176 and BS EN 1177, then we walk your team through the area.

Yes: a maintenance visit six months after opening, then maintenance, safety inspections, spare parts and upgrades on request.

Get in touch

Arrange a free West Yorkshire installation consultation

Use the form to outline your site, or call or email the team.

Product Interested In:
Service Interested In: