Made in Swansea for Bristol venues

Soft Play Manufacturers Bristol

Bespoke soft play frames, toddler zones and sensory rooms manufactured for play centres, nurseries, schools and family venues across Bristol.

What Bristol clients can expect
  • Building indoor play equipment since 2016
  • Bristol layouts drawn to BS EN 1176 and BS EN 1177
  • A 3D visual of your Bristol space before we cut any foam
  • Fitted by our own installers, never an agent
  • One supplier for design, build and servicing
  • A free, itemised quotation
Pebble & Nest soft play installation in London for ages 0 to 12 by Soft Play Supplies

Soft play we designed and built for Pebble & Nest, an indoor play venue in London

Bristol Play Spaces, Built by the Maker

Searching for soft play manufacturers in Bristol? Soft Play Supplies draws, cuts, stitches and assembles every component in our own Swansea factory, then sends our own fitters across the Severn to install it. We do not have an office, showroom or depot in Bristol, which keeps things simple: the people who design your play frame are the same people who build it and come back to look after it.

Bristol is a city of distinct neighbourhoods, and each one creates its own kind of demand. Young families in Bedminster, Southville and Bishopston want somewhere close to home for a rainy afternoon, the suburbs around Fishponds, Brislington and Henbury need party venues with parking, and the shopping districts of Broadmead and Cabot Circus draw visitors from across the West of England. A student population and a busy visitor trade at Harbourside add more footfall again.

Many local projects begin in buildings that were never meant for children. Plenty of indoor playground manufacturers in Bristol will quote from a catalogue, but we start with a survey of the real space: a warehouse unit in St Philips or Avonmouth, a Victorian church hall in Easton, a former shop on Gloucester Road or a classroom in a Hartcliffe primary school. Beams, columns, fire exits and floor loading all shape the design.

Do you operate venues beyond the city as well? Our soft play manufacturers UK page sets out how we run projects in several cities at once. Trading venues should read commercial soft play Bristol, and the fitting process is described on soft play installation Bristol.

Indoor Play Equipment We Manufacture for Bristol

A compact toddler corner in a Clifton café has little in common with a party-led centre on a trading estate near the M32, or a sensory suite in a south Bristol SEN school. Among indoor play equipment manufacturers in Bristol, the real difference is whether one firm owns both the drawing board and the factory floor. We do, so the 3D design you approve is exactly what arrives on the van.

Everything is manufactured to BS EN 1176, with Part 10 covering fully enclosed play, and laid over impact-absorbing safety surfacing that meets BS EN 1177. We use certified materials with coverings that tolerate daily wipe-downs.

Multi-level play frames

Tiered structures with slides, scramble nets, ball cannons and crawl tubes, designed around your ceiling height.

Baby and toddler zones

Gated, low-level padded areas so the youngest visitors can play safely away from older children.

Sensory rooms

Quiet rooms with lighting effects, tactile walls and soft flooring for SEN settings and relaxed sessions.

Foam shapes and mats

Free-standing blocks, steps and tunnels for community halls and rooms that need clearing after each session.

Bespoke theming

Harbour, jungle, city or brand-led themes using sculpted foam features and printed wall panels.

Active play

Trampoline zones, ninja runs and climbing challenges for older children and teenagers.

Bristol buyers can browse the full range on our products page, or find out more about indoor play equipment and ninja warrior courses.

Free consultation

Got a Bristol building in mind?

Send us a few details and our first reply can be genuinely useful:

  • The Bristol district or postcode and the kind of venue
  • Approximate floor area and the lowest ceiling point
  • Which ages the Bristol venue will serve
  • Whether it is a new build, a refit or an addition
  • Your budget range and hoped-for opening month

Happy to talk instead? Phone 01792 439436.

Product Interested In:
Service Interested In:

How a Bristol Project Comes Together

There are five stages between your first enquiry and the day the doors open in Bristol.

01

Consultation and survey

We talk through your plans, audience and budget, and survey the Bristol building if a visit will help.

02

Design and quotation

We prepare a layout, 3D visuals and a fully itemised quotation for you to approve before anything is made.

03

Manufacturing

Every part for your Bristol site is manufactured in our Swansea factory from certified materials and checked before it leaves.

04

Delivery and fitting

We deliver to your Bristol venue on the agreed day and our own installers build, test and clean up.

05

Handover and aftercare

Six months after opening we return for a maintenance visit, with maintenance, parts and add-ons available afterwards.

Soft Play Costs in Bristol

Because every Bristol building is different, we price each design individually rather than from a list. As a starting point, smaller, straightforward installations typically start from around £5,000, and large, fully themed commercial centres can exceed £250,000. Delivery to Bristol and fitting appear as their own lines on the quote.

What affects the cost

  • How much of the Bristol floor plan is given over to play
  • Ceiling height, which caps the number of levels
  • The balance of frames, toddler, sensory and active areas
  • Sculpted features, themes and printed graphics
  • Flooring, safety surfacing and other fit-out work
  • Access, such as city-centre parking, stairs or tight doorways

Lead time

How long a Bristol scheme takes depends mostly on its size. Once your Bristol design is approved and production confirmed, most installations can be completed within a matter of weeks.

We include a provisional timetable with the quotation so that contractors, staff training and your launch can be planned around it.

Finance and leasing

Bristol businesses that would rather not pay upfront can lease the equipment through Johnson Reed Ltd, a specialist soft play finance company, and pay monthly instead. That keeps capital free for the fit-out and opening costs.

This option is limited to UK business users and remains subject to status and credit approval. Johnson Reed may require a deposit, an advance rental payment or a personal guarantee, and may charge documentation fees.

Why Bristol Venues Work With Soft Play Supplies

Soft Play Supplies has been making play spaces since 2016, and when Bristol clients compare soft play manufacturers in Bristol with suppliers further afield, these points tend to settle it:

  • Design, manufacture and aftercare under one roof, with no hand-off between a salesperson and a factory
  • Safety built into every Bristol drawing, following BS EN 1176 and BS EN 1177
  • Dedicated project management, with technical drawings and fire-escape layouts ready for your architect, landlord or Bristol City Council building control
  • Our own engineers for inspections, spare parts and extensions
  • A wide sector track record, from nurseries to trampoline parks. Browse our sectors
Pink padded toddler play zone with soft seating steps in a commercial soft play centre

What our clients say

I recently had the pleasure of working with a trampoline park manufacturer that exceeded all of my expectations. From our very first interaction, their professionalism and commitment to great service were evident. They took the time to understand my vision and provided invaluable guidance throughout the entire process.

Ady, Jump Adventure

We recently had the pleasure of working with Soft Play Supplies, a soft play manufacturer, and we cannot recommend them enough. From start to finish, their team was professional, efficient, and dedicated to providing the best service possible. Their design team was able to bring our vision to life, creating a unique and engaging soft play area that exceeded our expectations.

William & Martha, Oakie Doke’s Playhouse

Projects One worked closely with Soft Play Supplies to deliver an unusual and challenging project in mainland Europe. The team were nothing short of outstanding from the design and estimating phase through to delivery and installation.

Richard, Projects One

Brands and venues we have worked with

Projects OneZoomania Play CentresSafari Soft Play CaféJump AdventureIndoor Jumping Club BarcelonaOakie Doke’s PlayhouseCefn Mably Farm ParkMoody Meadows Farm Park Pebble and Nest Rainforest RascalsZouch SchoolSgiliau Llanelli

Recent project gallery

Colourful soft play apparatus for children's playroom - Soft Play Supplies
Indoor soft play structure with mesh frames, platforms, hanging obstacles, and crawl tunnels for children’s play area
Padded wall panels, sensory mirror panel and safety matting fitted in a school soft play room
Indoor soft play and trampoline park installed at Moody Meadows Farm Park by Soft Play Supplies

There is no published Bristol case study yet; these photos come from Pebble & Nest in London, Sgiliau in Llanelli, Zouch School in Tidworth and other Soft Play Supplies projects.

Soft Play Manufacturers Bristol: Your Questions Answered

No. We work from one site in Swansea, where everything is designed and made. Our own installers travel to Bristol for fitting, and we visit beforehand when a survey is needed.

The whole city, from Avonmouth and Henbury in the north-west to Hengrove, Stockwood and Whitchurch in the south, along with Clifton, Redland, Easton, Fishponds and the city centre.

We are the manufacturer. Your design is drawn and built at our Swansea factory and fitted in Bristol by our own team, so there is no middleman.

We regularly design around low ceilings, pillars, uneven walls and narrow entrances. A survey comes first, and the layout follows the actual measurements and escape routes. Any consents for a listed building are for you or your architect to arrange.

Smaller, straightforward installations typically start from around £5,000, and large, fully themed centres can exceed £250,000. Space, height, equipment, theming and access all move the price, and every quotation is free and itemised.

That depends on the scale of the job, but once designs are approved and production is confirmed, most installations can be completed within a matter of weeks. The quote includes a timetable.

Yes: Bristol firms can lease through Johnson Reed Ltd as UK business users, subject to status and credit approval. The finance page explains how it works.

Unless something different is agreed in writing, payment is 50% as a deposit, 40% when the equipment is delivered and 10% once the work is complete.

No, planning and change-of-use applications are not something we handle. We do provide technical drawings, fire-escape layouts and specifications to support your own application.

We carry out a maintenance visit six months after you open. From then on, maintenance, inspections, repairs and new features can be booked whenever needed.

Get in touch

Start your Bristol play project with Soft Play Supplies

Tell us about your Bristol plans in the form, or use the phone and email details below.

Product Interested In:
Service Interested In: